Site survey and coverage assessment
A Wi-Fi site survey reviews spaces, devices and user numbers to identify weak coverage and areas where demand strains the network.

We assess coverage and real usage, then design, install and configure your wireless network to improve connection stability and performance.
Strong signal in one area, but weak coverage or dead zones elsewhere.
Slow Wi-Fi despite a good internet connection, with no clear cause.
Frequent dropouts or slower connections as more users join.
More access points, or unplanned placement, without better performance.
Unstable connections when moving between access points.
Larger premises or new uses, supported by the same old wireless design.
Your internet connection brings service to the premises. Wi-Fi carries that connection to devices inside. Improving one does not automatically fix the other, and adding an access point is not always the right next step.
Walls, building materials and access point locations can weaken the signal before it reaches the work area.
A strong signal does not mean the network can serve every user and application at the same time.
Channels, transmit power, settings and overlap between access points affect stability and performance.
We review placement, connectivity and existing infrastructure to identify the cause before proposing more hardware.
A Wi-Fi site survey reviews spaces, devices and user numbers to identify weak coverage and areas where demand strains the network.
Wireless coverage measurements and heatmap analysis are used when the project requires them, to clarify signal distribution and areas needing attention.
We plan access point numbers, placement and settings around coverage, capacity and building materials, avoiding arbitrary additions.
We install access points and configure wireless connectivity for users and indoor or outdoor spaces within the agreed scope.
We review interference, settings, device locations and connectivity. Reconfiguration, relocation or a partial upgrade may address the issue.
We review coverage, stability, capacity and roaming after deployment against site needs and the project scope.
Start with a Wi-Fi site survey to identify priorities and appropriate placement.
Equip an office, shop or warehouse, or plan Wi-Fi for a multi-floor commercial building and indoor or outdoor areas.
Support more staff and devices, an office extension or a new floor plan that changes coverage and capacity requirements.
Address weak signal or outages despite equipment changes, or assess placement before installing additional access points.
Provide guest Wi-Fi separated from the internal network, with access controls suited to the business.
Assessment defines the project: a new wireless network, improvements to existing Wi-Fi or managed guest connectivity.
Review users, devices, applications and current issues.
Assess spaces, signal and existing infrastructure.
Plan access point placement, configuration and connectivity.
Deploy equipment and configure the wireless network.
Review coverage, stability and the actual user experience.
Provide further optimization and support as needed within the agreed scope.
The Raseila approach
Access point planning considers spaces, walls, users and the way work happens.
We assess whether configuration or relocation can help before recommending additional equipment.
We consider signal quality and the network’s ability to support current demand and growth.
Post-installation testing reviews connectivity in the areas people use and while moving between access points.
No. Placement, channels, configuration or capacity may be the cause. Adding access points without planning can increase interference, so we assess the problem first.
Internet speed concerns the connection from your provider. Wi-Fi quality concerns the wireless link between devices and the network inside the premises. A good internet connection can still have weak wireless coverage or congested Wi-Fi.
We consider floor area, walls, building materials, users, devices, applications and the required coverage. The site survey informs the design; area alone is not enough.
It is an assessment of the site and network to understand coverage, usage, access point locations and factors affecting connectivity. Measurements and coverage maps may be included when required by the project.
Yes, when the equipment and infrastructure are suitable. Configuration changes, access point relocation or a partial upgrade may be enough. Assessment determines the appropriate approach.
Yes, according to project needs. Guest connectivity can be separated from the internal network, with a captive portal, authentication and access management within the agreed scope.
Next step
Start with a survey of your site and existing network to understand what coverage and performance actually need.